NYMR Winter 2009/2010

NYMR Winter services and Maintenance

<-- Index | Showing 1-23 of 23 pictures | Index -->
Thumper unit in Goathland loop
Thumper unit in Goathland loop
Forlorn looking Thumper spending its final days on the NYMR, The unit is due to move to Newbridge on Wednesday and will be transported by road to the Epping and Ongar railway Thursday and Saturday
Forlorn looking Thumper spending its final days on the NYMR, The unit is due to move to Newbridge on Wednesday and will be transported by road to the Epping and Ongar railway Thursday and Saturday
The jib is lowered on the Coles ready for travelling
The jib is lowered on the Coles ready for travelling

The 24 and 25 climb through the mist
The 24 and 25 climb through the mist





A load of 22x 22' rail to form a new road deck and walkway deck on Bridge 20
A load of 22x 22' rail to form a new road deck and walkway deck on Bridge 20
The pair of Sulzer Type 2s Set back towards Bridge 20 for rails to be unloaded
The pair of Sulzer Type 2s Set back towards Bridge 20 for rails to be unloaded



The Thumper is shunted onto the mainline
The Thumper is shunted onto the mainline

D7628
D7628

Thumper 205205 at Levisham
Thumper 205205 at Levisham
Motor coach 60110 is turned at Pickering
Motor coach 60110 is turned at Pickering
C&W shunters in Pickering
C&W shunters in Pickering
205205 makes its final journey on the NYMR propelled to Newbridge yard by D7628
205205 makes its final journey on the NYMR propelled to Newbridge yard by D7628